首页 > 职业资格考试
题目内容 (请给出正确答案)
[主观题]

134Good project objectives must be: A.General rather than specific B.Established without c

134 Good project objectives must be:

A. General rather than specific

B. Established without considering resource bounds

C. Realistic and attainable

D. Overly complex

E. Measurable, intangible and verifiable

查看答案
答案
收藏
如果结果不匹配,请 联系老师 获取答案
您可能会需要:
您的账号:,可能还需要:
您的账号:
发送账号密码至手机
发送
安装优题宝APP,拍照搜题省时又省心!
更多“134Good project objectives mus…”相关的问题
第1题
Which is the best way to change the same parameter for a large number of managed obje

A.use the CNA property windows

B.use the CNA scroll-bar window

C.use the CNA table

点击查看答案
第2题
The project charter is a document designed to tell _____ exactly what the project entails.

AThe project manager

BThe project office

CThe project team

DThe project sponsor

EAnyone associated with the project

点击查看答案
第3题
The key purpose of project control is to:A.Plan ahead for uncertainties.B.Generate status

The key purpose of project control is to:

A.Plan ahead for uncertainties.

B.Generate status reports.

C.Keep the project on track.

D.Develop the project road map.

E.All of the above.

点击查看答案
第4题
100Interfacing with the customer after project go-ahead is the responsibility of: A.Projec

100 Interfacing with the customer after project go-ahead is the responsibility of:

A. Project sponsor

B. Project team

C. Project manager

D. Functional manager

E. All of the above are possible, based upon the size and complexity of the project

点击查看答案
第5题
project()

A.工程,项目

B.节目

C.保护

点击查看答案
第6题
49The project life-cycle can be described as: A.project concept, project planning, project

49 The project life-cycle can be described as:

A. project concept, project planning, project execution, and project close-out.

B. project planning, work authorization, and project reporting.

C. project planning, project control, project definition, WBS development, and project termination. D. project concept, project execution, and project reporting.

E. All of the above

点击查看答案
第7题
The project life-cycle can be described as:A.project concept, project planning, project ex

The project life-cycle can be described as:

A.project concept, project planning, project execution, and project close-out.

B.project planning, work authorization, and project reporting.

C.project planning, project control, project definition, WBS development, and project termination.

D.project concept, project execution, and project reporting.

E.All of the above.

点击查看答案
第8题
167The project life-cycle can be described as: A.project concept, project planning, projec

167 The project life-cycle can be described as:

A. project concept, project planning, project execution, and project close-out.

B. project planning, work authorization, and project reporting.

C. project planning, project control, project definition, WBS development, and project termination. D. project concept, project execution, and project reporting.

E. All of the above

点击查看答案
第9题
84Risk management allows the project manager and the project team to: A.eliminate most ris

84 Risk management allows the project manager and the project team to:

A. eliminate most risks during the planning phase of the project

B. identify project risks

C. identify impacts of various risks

D. plan suitable responses

E. B, C and D only

点击查看答案
第10题
It is useful to conduct project risk assessment according to the project'sAcharterBstateme

It is useful to conduct project risk assessment according to the project's

A charter

B statement of work

C Work Breakdown structure

D network

E budget

点击查看答案
退出 登录/注册
发送账号至手机
密码将被重置
获取验证码
发送
温馨提示
该问题答案仅针对搜题卡用户开放,请点击购买搜题卡。
马上购买搜题卡
我已购买搜题卡, 登录账号 继续查看答案
重置密码
确认修改