Using the WBS shown in the Special window, a typical work package would be:ASoftware devel

Using the WBS shown in the Special window, a typical work package would be:

ASoftware development

BSystems design

CCoding

DA, B, and C

ENone of the above.

查看答案
答案
收藏
如果结果不匹配,请 联系老师 获取答案
您可能会需要:
您的账号:,可能还需要:
您的账号:
发送账号密码至手机
发送
安装优题宝APP,拍照搜题省时又省心!
更多“Using the WBS shown in the Spe…”相关的问题
第1题
133Using the WBS shown in the Special window, a typical work package would be: A.Software

133 Using the WBS shown in the Special window, a typical work package would be:

A. Software development

B. Systems design

C. Coding

D. A, B, and C

E. None of the above

点击查看答案
第2题
Using the WBS in the Special window, an instance of a work package is:A.Build houseB.Excav

Using the WBS in the Special window, an instance of a work package is:

A.Build house

B.Excavate

C.Prepare Foundation

D.B and C

E.None of the above

点击查看答案
第3题
Which of the following can be tracked using the WBS?A.timeB.costC.performanceD.scopeE.None

Which of the following can be tracked using the WBS?

A.time

B.cost

C.performance

D.scope

E.None of the above.

点击查看答案
第4题
60Which of the following can be tracked using the WBS? A.time B.cost C.performance D.scope

60 Which of the following can be tracked using the WBS?

A. time

B. cost

C. performance

D. scope

E. None of the above

点击查看答案
第5题
101Parametric cost estimating involves A.using the WBS to do bottom up estimates B.definin

101 Parametric cost estimating involves

A. using the WBS to do bottom up estimates

B. defining the perimeters of the life-cycle

C. calculating the individual estimates of work packages

D. using a statistical model to estimate costs

E. A and C

点击查看答案
第6题
19Using the situation shown in the Special window and assuming continues efficiency for wo

19 Using the situation shown in the Special window and assuming continues efficiency for work-in-progress and fixed price contract for task four. The estimate at completion is:

A. $19K

B. $21K

C. $26K

D. $29K

E. indeterminate

点击查看答案
第7题
Using the possible profit and loss outcomes shown in the Special window, find the expected
profit (loss)

A ¥-1,000

B ¥1,000

C ¥2,000

D ¥1,200

E None of the above

点击查看答案
第8题
101Using the situation stated in the Special window, which WBS element is behind schedule

101 Using the situation stated in the Special window, which WBS element is behind schedule but under budget?

A. Element P

B. Element Q

C. Element R

D. Element S

E. None of the above

点击查看答案
第9题
19Parametric cost estimating involves A.using the WBS to do bottom up estimates B.defining

19 Parametric cost estimating involves

A. using the WBS to do bottom up estimates

B. defining the perimeters of the life-cycle

C. calculating the individual estimates of work packages

D. using a statistical model to estimate costs

E. A and C

点击查看答案
第10题
105Using the situation stated in the Special window, WBS Element Q is _____ budget by ____

105 Using the situation stated in the Special window, WBS Element Q is _____ budget by _____ percent.

A. Over, 16.66

B. Under, 16.66

C. Over, 10.0

D. Under, 10.0

E. None of the above

点击查看答案
退出 登录/注册
发送账号至手机
密码将被重置
获取验证码
发送
温馨提示
该问题答案仅针对搜题卡用户开放,请点击购买搜题卡。
马上购买搜题卡
我已购买搜题卡, 登录账号 继续查看答案
重置密码
确认修改