首页 > 益智题库
题目内容 (请给出正确答案)
[单选题]

Changing the oil and filter on your car every 3,000 miles is an example of what kind

A.concurrent control

B.feedforward control

C.definitional control

D.feedback control

E.projected control

查看答案
答案
收藏
如果结果不匹配,请 联系老师 获取答案
您可能会需要:
您的账号:,可能还需要:
您的账号:
发送账号密码至手机
发送
安装优题宝APP,拍照搜题省时又省心!
更多“Changing the oil and filter on…”相关的问题
第1题
Her moods are as______as the weather in London.

A.changeable

B.changed

C.change

D.changing

点击查看答案
第2题
Which may be employed to shorten a schedule without changing the scope of the task?A.Fast

Which may be employed to shorten a schedule without changing the scope of the task?

A.Fast tracking.

B.Crashing

C.Releasing resources earlier from tasks which were scheduled with a late start.

D.Alter to task priorities.

E.A or B

点击查看答案
第3题
The most common cause of lowering the crankcase lube oil flash point is _____.A.more water

The most common cause of lowering the crankcase lube oil flash point is _____.

A.more water contents

B.contamination with fuel oil

C.higher temperature

D.sufficient cooling of oil mist

点击查看答案
第4题
A shortage of OPEC oil at current market prices will increase oil prices because of().

A.the law of elastic supply

B.the law of elastic demand

C.consumers will bid up the price of oil

D.all of the above

E.none of the above

点击查看答案
第5题
In discussing oil pollution, one important fact to remember is that the problem remain
s the same()heavy()light oil is spilled into the water.

A.both/and

B.whether/or

C.neither/nor

D.because/so

点击查看答案
第6题
When finish work on the oil separator, you should____ firstly.A.cut off the powerB.cut off

When finish work on the oil separator, you should____ firstly.

A.cut off the power

B.cut off the oil inlet

C.open guide water valve

D.close oil outlet value

点击查看答案
第7题
—— Would you mind changing seat with me?—— __________.

A.No, that’s all right.

B.Of course, I like to.

C.Yes, you can.

D.Certainly, please do.

点击查看答案
第8题
139By which means is a contractor able to control cost overruns due to changing requiremen

139 By which means is a contractor able to control cost overruns due to changing requirements? A. Project data review

B. Change order

C. Purchase order amendment

D. Change control

E. None of the above

点击查看答案
第9题
The lubricating oil cooler is circulated by sea water or low temperature fresh water, wh
ich is at a higher pressure than the oil. As a result any leak in the cooler will mean a loss of oil and not contamination of the oil by water.()

此题为判断题(对,错)。

点击查看答案
第10题
Which of the following operations must be entered on the Oil Record Book Part I? IRoutine
discharge at sea of bilge water containing oil from the machinery spaces IIBunkering of fuel oil

A.I only

B.II only

C.both I and II

D.neither I nor II

点击查看答案
第11题
Ships changing their location within the port limits are also required to report their new
______.

A.bearings

B.distances

C.sections

D.positions

点击查看答案
退出 登录/注册
发送账号至手机
密码将被重置
获取验证码
发送
温馨提示
该问题答案仅针对搜题卡用户开放,请点击购买搜题卡。
马上购买搜题卡
我已购买搜题卡, 登录账号 继续查看答案
重置密码
确认修改