首页 > 职业资格考试
题目内容 (请给出正确答案)
[主观题]

Project tradeoffs are usually made by comparing _____ and constraints.ATime, cost, and qua

Project tradeoffs are usually made by comparing _____ and constraints.

ATime, cost, and quality

BTime, risk, and quality

CRisk, quality, and manpower availability

DCost, quality, and technical performance

ECost, quality, and risk

查看答案
答案
收藏
如果结果不匹配,请 联系老师 获取答案
您可能会需要:
您的账号:,可能还需要:
您的账号:
发送账号密码至手机
发送
安装优题宝APP,拍照搜题省时又省心!
更多“Project tradeoffs are usually …”相关的问题
第1题
3Project tradeoffs are usually made by comparing _____ and constraints. A.Time, cost, and

3 Project tradeoffs are usually made by comparing _____ and constraints.

A. Time, cost, and quality

B. Time, risk, and quality

C. Risk, quality, and manpower availability

D. Cost, quality, and technical performance

E. Cost, quality, and risk

点击查看答案
第2题
85Project tradeoffs are usually made by comparing _____ and constraints. A.Time, cost, and

85 Project tradeoffs are usually made by comparing _____ and constraints.

A. Time, cost, and quality

B. Time, risk, and quality

C. Risk, quality, and manpower availability

D. Cost, quality, and technical performance

E. Cost, quality, and risk

点击查看答案
第3题
71There are hard causes of conflict (e.g. conflicting schedules) and soft causes. Soft cau

71 There are hard causes of conflict (e.g. conflicting schedules) and soft causes. Soft causes are as important as hard causes. Soft causes include diversity of disciplinary expertise, _____, and the project manager's power of reward and punishment.

A. Performance tradeoffs

B. Ambiguity of roles

C. Administrative procedures

D. Determining earned value

点击查看答案
第4题
项目的平衡Tradeoffs通常是通过对及制约条件进行对比而做出的() A.时间成本及质量

项目的平衡Tradeoffs通常是通过对及制约条件进行对比而做出的 ()

A.时间成本及质量

B.时间风险及质量

C.风险质量及可获取的人力资源

D.成本质量及技术方案

点击查看答案
第5题
假定经济的菲利普斯曲线是:π=π-1-0.5(u-un),而且自然失业率是由过去两年失业的平均数给出的:un=0.5(u-1+u-2

假定经济的菲利普斯曲线是:π=π-1-0.5(u-un),而且自然失业率是由过去两年失业的平均数给出的:un=0.5(u-1+u-2)。

a.为什么自然失业率会取决于最近的失业(正如在上式中所假设的)?

b.假设美联储遵循永久性地降低通货膨胀1%的政策。这种政策对一段时期中的失业率有什么影响?

c.这个经济中的牺牲率是多少?请解释。

d.这些方程式对通货膨胀与失业之间的短期和长期取舍关系意味着什么?

Suppose that an economy has the Phillips curve π=π-1-0.5(u-un), and that the natural rate of unemployment is given by an average of the past two years'unemployment: un=0.5(u-1+u-2).

a.Why might the natural rate of unemployment depend on recent unemployment (as is assumed in the preceding equation)?

b.Suppose that the Fed follows a policy to reduce permanently the inflation rate by 1 percentage point. What effect that policy will have on the unemployment rate over time?

c.What is the sacrifice ratio in this economy? Explain.

d.What do these equations imply about the short-run and long-run tradeoffs between inflation and unemployment?

点击查看答案
第6题
The project charter is a document designed to tell _____ exactly what the project entails.

AThe project manager

BThe project office

CThe project team

DThe project sponsor

EAnyone associated with the project

点击查看答案
第7题
49The project life-cycle can be described as: A.project concept, project planning, project

49 The project life-cycle can be described as:

A. project concept, project planning, project execution, and project close-out.

B. project planning, work authorization, and project reporting.

C. project planning, project control, project definition, WBS development, and project termination. D. project concept, project execution, and project reporting.

E. All of the above

点击查看答案
第8题
The project life-cycle can be described as:A.project concept, project planning, project ex

The project life-cycle can be described as:

A.project concept, project planning, project execution, and project close-out.

B.project planning, work authorization, and project reporting.

C.project planning, project control, project definition, WBS development, and project termination.

D.project concept, project execution, and project reporting.

E.All of the above.

点击查看答案
第9题
167The project life-cycle can be described as: A.project concept, project planning, projec

167 The project life-cycle can be described as:

A. project concept, project planning, project execution, and project close-out.

B. project planning, work authorization, and project reporting.

C. project planning, project control, project definition, WBS development, and project termination. D. project concept, project execution, and project reporting.

E. All of the above

点击查看答案
第10题
常见的膜系有()

A.R/AR、AR/IR、IR

B.R、AR/AR、AR/IR

C.R/IR、AR、AR/AR、IR

点击查看答案
退出 登录/注册
发送账号至手机
密码将被重置
获取验证码
发送
温馨提示
该问题答案仅针对搜题卡用户开放,请点击购买搜题卡。
马上购买搜题卡
我已购买搜题卡, 登录账号 继续查看答案
重置密码
确认修改