115The technique most commonly used to determine the profitability of a project includes _

115 The technique most commonly used to determine the profitability of a project includes _____ methods.

A. Net present value (NPV).

B. Return on investment (ROI).

C. Discounted cash flow (DCF)

D. Payout time and risk sensitivity analysis.

E. All of the above

查看答案
答案
收藏
如果结果不匹配,请 联系老师 获取答案
您可能会需要:
您的账号:,可能还需要:
您的账号:
发送账号密码至手机
发送
安装优题宝APP,拍照搜题省时又省心!
更多“115The technique most commonly…”相关的问题
第1题
115The purpose of configuration management is to: A.insure drawings are updated B.control

115 The purpose of configuration management is to:

A. insure drawings are updated

B. control change throughout the project

C. control change during the production only

D. generate engineering change proposals

E. inform. the project manager of changes

点击查看答案
第2题
115The sequential steps that define the process for successfully completing a project is:

115 The sequential steps that define the process for successfully completing a project is: A. Implementation Plan

B. a life cycle

C. Development Plan

D. a critical path

E. Management Plan

点击查看答案
第3题
115The strong matrix versus a weak matrix. A.team members are more likely to be assigned t

115 The strong matrix versus a weak matrix.

A. team members are more likely to be assigned to the project office in a strong matrix

B. strong matrix is more difficult to manage.

C. the balance of power has shifted away from the PM.

D. functional managers no longer has control over the technical processes.

E. All of the above

点击查看答案
第4题
“IT”是哪两个单词的缩写()

A.infrastructure technology

B.information technology

C.information technique

D.infrastructure technique

点击查看答案
第5题
technique()

A.策略,战术

B.技术,技能

C.目标,对象

D.滋味,味觉

点击查看答案
第6题
Many people call the age we live in the age of____ (technique)
Many people call the age we live in the age of____ (technique)

点击查看答案
第7题
Monte Carlo simulation:AWas originally developed by Dr. CarloBIs a European technique for

Monte Carlo simulation:

A Was originally developed by Dr. Carlo

B Is a European technique for assessing project risks

C assumes the future risk events will occur at random according to predetermined probability distributions

D is a technique to stimulate create risk event resolution

E A, B and C only

点击查看答案
第8题
Which of the following statements is true? _________

A、If a new coding technique will reduce coding time, developing team should surely adopt it to develop projects, which will save time and cost versus the old coding technique

B、A good coding technique cannot surely speed up the whole software development

C、Adding more people to a project that is already behind schedule is a good way to catch up

D、Good software systems do not need maintenance

点击查看答案
第9题
In performing an impact analysis, the most effective tool to ensure all risks are identifi
ed on large projects is the:

A Work breakdown structure

B milestone review and schedule technique

C cost/schedule control system

D planning programming budget system

E program and evaluation review technique

点击查看答案
第10题
21The compromise conflict resolution technique A.is necessary when both participants must

21 The compromise conflict resolution technique

A. is necessary when both participants must win.

B. results in both sides losing

C. is used when resolution is more important than relationships

D. B and C

E. All of the above.