139The scope baseline once established and approved, is used: A.as the basis for making fu

139 The scope baseline once established and approved, is used:

A. as the basis for making future decisions.

B. to accomplish verification measures.

C. to evaluate potential changes.

D. All of the above.

E. A and C only

查看答案
答案
收藏
如果结果不匹配,请 联系老师 获取答案
您可能会需要:
您的账号:,可能还需要:
您的账号:
发送账号密码至手机
发送
安装优题宝APP,拍照搜题省时又省心!
更多“139The scope baseline once est…”相关的问题
第1题
The scope management provides:A.A basis for future decisions about the project.B.A baselin

The scope management provides:

A.A basis for future decisions about the project.

B.A baseline to accomplish verification measures.

C.A baseline to evaluate potential scope changes.

D.All of the above.

E.B and C only.

点击查看答案
第2题
88The scope statement provides A.A basis for future decisions about a project. B.A baselin

88 The scope statement provides

A. A basis for future decisions about a project.

B. A baseline to accomplish verification measures.

C. A baseline to evaluate potential scope changes.

D. All of the above

E. B and C only

点击查看答案
第3题
139The project charter is a document designed to tell _____ exactly what the project entai

139 The project charter is a document designed to tell _____ exactly what the project entails.

A. The project manager

B. The project office

C. The project team

D. The project sponsor

E. Anyone associated with the project

点击查看答案
第4题
139The initial cost of a product and the product's operation and maintenance costs _____ .

139 The initial cost of a product and the product's operation and maintenance costs _____ .

A. increases perceived value when balanced.

B. are incidental to each other because initial costs are "sunk"

C. decreases design costs as operation periods increase

D. provides perceived function value and product social dysfunction

E. are integrally related with each other because initial costs are "sunk"

点击查看答案
第5题
142The project charter is prepared in which scope management process? A.Initiation B.Scope

142 The project charter is prepared in which scope management process?

A. Initiation

B. Scope planning

C. Scope Definition

D. Scope change control

E. Scope verification

点击查看答案
第6题
23The work breakdown structure (WBS) is first developed in which scope management process?

23 The work breakdown structure (WBS) is first developed in which scope management process? A. Initiation

B. Scope planning

C. Scope change control

D. Scope

Definition

E. Scope verification

点击查看答案
第7题
In which of the following scope management processes is the scope management plan prepared

A . Initiation

B . Scope planning

C . Scope Definition

D . Scope change control

E . Scope verification

点击查看答案
第8题
25In which of the following scope management processes is the scope management plan prepar

25 In which of the following scope management processes is the scope management plan prepared? A. Initiation

B. Scope planning

C. Scope Definition

D. Scope change control

E. Scope verification

点击查看答案
第9题
The project charter is prepared in which scope management process?A.InitiationB.Scope plan

The project charter is prepared in which scope management process?

A . Initiation

B . Scope planning

C . Scope Definition

D . Scope change control

E . Scope verification

点击查看答案
第10题
26Which of the following is not a scope management process? A.Initiation B.Scope planning

26 Which of the following is not a scope management process?

A. Initiation

B. Scope planning

C. Scope Definition

D. Scope change control

E. Scope verification

点击查看答案