28The Pareto Principle is a technique used to determine which quality control problems in

28 The Pareto Principle is a technique used to determine which quality control problems in a particular process should be corrected. Which of the following statements best represents the philosophy employed by this principle?

A. In order to minimize financial losses from quality control problems, all problems which have a measureable cost should be corrected

B. the majority of defects are caused by a small percentage of the identifiable problems. Improvement efforts should be reserved for these vital problems. C. in order to achieve zero defects, all quality control problems, including those which do not have a direct financial cost should be corrected.

D. generally, 80% of the quality control problems are justifiable for correction via cost-benefit analysis. The remaining 20% are not financially worthy of improvement efforts.

E. A and D

查看答案
答案
收藏
如果结果不匹配,请 联系老师 获取答案
您可能会需要:
您的账号:,可能还需要:
您的账号:
发送账号密码至手机
发送
安装优题宝APP,拍照搜题省时又省心!
更多“28The Pareto Principle is a te…”相关的问题
第1题
28The Cost Performance Index (CPI) measures A.total costs B.performance over a period of t

28 The Cost Performance Index (CPI) measures

A. total costs

B. performance over a period of time

C. costs at a point of time

D. variable costs

E. All of the above

点击查看答案
第2题
28The planned cost for the total project at its inception is called the _____. A.Cost of g

28 The planned cost for the total project at its inception is called the _____.

A. Cost of goods sold.

B. Depreciable value.

C. Budgeted cost.

D. All of the above.

E. B and C only

点击查看答案
第3题
28The work breakdown structure (WBS) is an excellent tool for objective control and evalua

28 The work breakdown structure (WBS) is an excellent tool for objective control and evaluation. Which of the following is generally NOT validated through the WBS?

A. Time, schedule and cost.

B. Management coordination and organization structuring.

C. Work methods and accountability.

D. Quality of work.

E. Risk and impact decision-making

点击查看答案
第4题
28The five major cost categories of quality are _____ . A.prevention, appraisal, internal

28 The five major cost categories of quality are _____ .

A. prevention, appraisal, internal failures, external failures, and equipment (measurement and test). B. specifications, QA programs, QC programs, parts rejected and parts returned

C. Staffing, Training, reviews, equipment and rejected goods

D. sampling, design considerations, manufacturing considerations, training and rework.

E. None of the above

点击查看答案
第5题
28The reason that cost management is so difficult in project management is that: A.Project

28 The reason that cost management is so difficult in project management is that:

A. Projects by definition and nature are non-recurring events and are therefore difficult to predict.

B .There are no tools for identifying project tasks.

C. Project managers do not care about tracking costs, as only schedules are important to all project managers.

D. A and B only

E. B and C only

点击查看答案
第6题
资产维护策略制定使用到的工具有()

A.Pareto分析

B.SWOT分析

C.VSM

D.PM分析

点击查看答案
第7题
在什么时候使用Pareto?()

A.决定需要重点关注的地方

B.显著问题

C.问题分类

D.发现不良

点击查看答案
第8题
二八原则是由维弗雷多帕累托(Vilfredo Pareto,意大利经济学家、社会学家)于1897年提出的。()
点击查看答案
第9题
Quality and _____ are directly related.A.productivityB.cost overrunsC.scope controlD.Paret

Quality and _____ are directly related.

A . productivity

B . cost overruns

C . scope control

D . Pareto diagram

E . None of the above.

点击查看答案
第10题
大多数质量问题是由于几个主要因素所导致,基于这样一个概念的工具称为:a. 巴雷托Pareto分析 b.

大多数质量问题是由于几个主要因素所导致,基于这样一个概念的工具称为:

a. 巴雷托Pareto分析

b. 计划评审技术PERT分析

c. 根本原因分析

d. 能力研究