140The three most common types of project cost estimates are: A.Order of magnitude, parame

140 The three most common types of project cost estimates are:

A. Order of magnitude, parametric, and budget.

B. Parametric, definitive and top down.

C. Order of magnitude, definitive and bottom up.

D. Order of magnitude, budget and definitive.

E. Analogy, parametric and top down

查看答案
答案
收藏
如果结果不匹配,请 联系老师 获取答案
您可能会需要:
您的账号:,可能还需要:
您的账号:
发送账号密码至手机
发送
安装优题宝APP,拍照搜题省时又省心!
更多“140The three most common types…”相关的问题
第1题
Cardio Co manufactures three types of fitness equipment: treadmills (T), cross trainers (C

Cardio Co manufactures three types of fitness equipment: treadmills (T), cross trainers (C) and rowing machines (R). The budgeted sales prices and volumes for the next year are as follows:

Cardio Co manufactures three types of fitness equi

Labour costs are 60% fixed and 40% variable. General fixed overheads excluding any fixed labour costs are expected to be $55,000 for the next year.

Required:

(a) Calculate the weighted average contribution to sales ratio for Cardio Co. (4 marks)

(b) Calculate the margin of safety in $ revenue for Cardio Co. (3 marks)

(c) Using the graph paper provided and assuming that the products are sold in a CONSTANT MIX, draw a multi-product breakeven chart for Cardio Co. Label fully both axes, any lines drawn on the graph and the breakeven point. (6 marks)

(d) Explain what would happen to the breakeven point if the products were sold in order of the most profitable products first.

Note: You are NOT required to demonstrate this on the graph drawn in part (c). (2 marks)

点击查看答案
第2题

Radio, television and press () of conveying news and information.

A.are the most three common means

B.are the most common three means

C.are the three most common means

D.are three the most common means

点击查看答案
第3题
of the three branches of phonetics, the longest established, and untilrecently the most highly developed, is()phonetics.

A.auditory

B.acoustic

C.articulatory

D.none of the above three

点击查看答案
第4题
Radio, television and press areof conveying news and information()

A.the most three common means

B.the three most common means

C.the most common three means

D.three the most common means

点击查看答案
第5题
Today, in the minds of most Americans, the American family has meant ______family, co

A.an extended

B.a nuclear

C.a small

D.a modern

点击查看答案
第6题
Which of the following will be treated as a subsidiary of Poulgo Co as at 31 December 20X7

(1) The acquisition of 60% of Zakron Co’s equity share capital on 1 March 20X7. Zakron Co’s activities are significantly different from the rest of the Poulgo group of companies

(2) The offer to acquire 70% of Unto Co’s equity share capital on 1 November 20X7. The negotiations were finally signed off during January 20X8

(3) The acquisition of 45% of Speeth Co’s equity share capital on 31 December 20X7. Poulgo Co is able to appoint three of the ten members of Speeth Co’s board

A.1 only

B.2 and 3

C.3 only

D.1 and 2

点击查看答案
第7题
27The "rolling wave" or "moving window" concept is used most frequently on projects where:

27 The "rolling wave" or "moving window" concept is used most frequently on projects where:

A. The baseline is frozen for the duration of the project and no scope changes are permitted

B. Marketing is unsure of what the customer actually wants and reserves the right to make major scope changes

C. The low levels of the work breakdown structure are known with certainty for the next three to six months, but the remaining tasks are based upon the results of the first three to six months of work D. Networking techniques are not appropriate

E. All of the above

点击查看答案
第8题
The phrase "be brought forward" in Para. 1 most probably means ______.A.be expectedB.be co

The phrase "be brought forward" in Para. 1 most probably means ______.

A.be expected

B.be completed

C.be advanced

D.be introduced

点击查看答案
第9题
The three most common types of project cost estimates are:A.Order of magnitude, parametric

The three most common types of project cost estimates are:

A . Order of magnitude, parametric, and budget.

B . Parametric, definitive and top down.

C . Order of magnitude, definitive and bottom up.

D . Order of magnitude, budget and definitive.

E . Analogy, parametric and top down.

点击查看答案
第10题
22The three most common types of project cost estimates are: A.Order of magnitude, paramet

22 The three most common types of project cost estimates are:

A. Order of magnitude, parametric, and budget.

B. Parametric, definitive and top down.

C. Order of magnitude, definitive and bottom up.

D. Order of magnitude, budget and definitive.

E. Analogy, parametric and top down

点击查看答案