A.PTNL3节点NNI
B.PTNL2/L3节点UNI
C.PTNL2/L3节点NNI
D.PTNL3节点UNI
"Hard logic" in the preparation of a network refers to:
A.Discretionay dependencies
B.External depenencies
C.Mandatory dependencies
D.All of the above
E.A abd B only
A.Soft logic
B.Hard logic
C.An external dependency
D.A mandatory dependency
E.A lost cause
A.Discretionary
B.Mandatory
C.External
D.Soft logic
E.Subcontracted
A、process or life cycle process or life cycle
B、paradigm
C、logic
D、business
82 Once the logic of a network is laid out, the project manager will conduct a forward pass and backward pass through the network. This will provide information on the _____ and identification of the _____ . A. Slack for each activity, critical path.
B. Slack for each activity, high risk activities.
C. Manpower shortages, high risk activities.
D. High risk activities, non-critical paths.
E. Manpower availability, contingency plans
SNI/UNI接口测试,10GE,GE和FE接口。平均发射光功率。在S参考点测得的平均光功率应满足设计和设备供应方承诺的指标要求,在ODF架上测试时,允许引入不大于()dB衰减。
A.This is a valid representation if the logic is correct.
B.This is invalid because a node can have a maximum of one dummy input representation if the logic is correct.
C.This is invalid because nodes cannot have both dummy inputs and dummy outputs.
D.This is a invalid because the number of outputs must equal the number of inputs.
E.This is invalid because a maximum of two inputs and two outputs are allowed using the critical path method.