第1题
"Hard logic" in the preparation of a network refers to:A.Discretionay dependenciesB.Extern

"Hard logic" in the preparation of a network refers to:

A.Discretionay dependencies

B.External depenencies

C.Mandatory dependencies

D.All of the above

E.A abd B only

点击查看答案
第2题
A completion of a local government study resides on your critical path. This would most li
kely be referred to as:

A.Soft logic

B.Hard logic

C.An external dependency

D.A mandatory dependency

E.A lost cause

点击查看答案
第3题
The erection of foundation formwork before the placement of foundation concrete would be a
n example of a _____ dependency.

A.Discretionary

B.Mandatory

C.External

D.Soft logic

E.Subcontracted

点击查看答案
第4题
可以不必声明而直接引用的数据类型是

A. STD LOGIC

B. STD_ LOGIC VECTOR

C. BIT

D.前面三个答案都是错误的

点击查看答案
第5题
arithmetic logic unit的中文释义为“算术逻辑单元”()
点击查看答案
第6题
The series of phases that software undergoes, from concept exploration to final retire
ment, is termed its _______.

A、process or life cycle process or life cycle

B、paradigm

C、logic

D、business

点击查看答案
第7题
82Once the logic of a network is laid out, the project manager will conduct a forward pass

82 Once the logic of a network is laid out, the project manager will conduct a forward pass and backward pass through the network. This will provide information on the _____ and identification of the _____ . A. Slack for each activity, critical path.

B. Slack for each activity, high risk activities.

C. Manpower shortages, high risk activities.

D. High risk activities, non-critical paths.

E. Manpower availability, contingency plans

点击查看答案
第8题
Your team has prepared a CPM schedule for your review. You notice that one node has six in
puts (including two dummy activities) and four outputs (which include one dummy activity). Select the correct statement from the following:

A.This is a valid representation if the logic is correct.

B.This is invalid because a node can have a maximum of one dummy input representation if the logic is correct.

C.This is invalid because nodes cannot have both dummy inputs and dummy outputs.

D.This is a invalid because the number of outputs must equal the number of inputs.

E.This is invalid because a maximum of two inputs and two outputs are allowed using the critical path method.

点击查看答案
第9题
Once the logic of a network is laid out, the project manager will conduct a forward pass a
nd backward pass through the network. This will provide information on the _____ and identification of the _____ .

A.Slack for each activity, critical path.

B.Slack for each activity, high risk activities.

C.Manpower shortages, high risk activities.

D.High risk activities, non-critical paths.

E.Manpower availability, contingency plans.

点击查看答案
第10题
169Your team has prepared a CPM schedule for your review. You notice that one node has six

169 Your team has prepared a CPM schedule for your review. You notice that one node has six inputs (including two dummy activities) and four outputs (which include one dummy activity). Select the correct statement from the following:

A. This is a valid representation if the logic is correct.

B. This is invalid because a node can have a maximum of one dummy input representation if the logic is correct.

C. This is invalid because nodes cannot have both dummy inputs and dummy outputs.

D. This is a invalid because the number of outputs must equal the number of inputs.

E. This is invalid because a maximum of two inputs and two outputs are allowed using the critical path method

点击查看答案