A Project Status Report would include all of the following except:
A Cost and schedule reports
B Changes to scope. cost or schedule
C Narrative explanation of variances
D Personnel problems on the project
E Upcoming activities
16 Inspection of a complex project according to specifications is accomplished by _____.
A. inspection by attributes.
B cyclical inspection
C. quality conformance inspection
D. original inspection
E. None of the above
Inspection of a complex project according to specifications is accomplished by _____.
A . inspection by attributes.
B . cyclical inspection
C . quality conformance inspection
D . original inspection
E . None of the above.
A.quantity
B.quality
C.package
D.place of production
Prior to magnetic particle inspection of anchor chain,the chain should be ______.
A.Degaussed
B.Demagnetized
C.Soaked
D.Sandblasted
A.Deep Packet Inspection
B.Dots Per Inch
C.discover packet incident
D.disposable personal income
123 Which of the following constitute Juran's "quality trilogy":
A. planning, inspection, control.
B. planning, improvement, control.
C. planning, organization, control.
D. product, price, customer.
E. design, build, deliver.
A.Check of rack and cabinet installation
B.Cable inspection
C.Label checking
D.Site cleaning
Inspection processes are considered _____.
A . an investment in the future
B . an effective corrective process
C . a necessary control process
D . insults to production line employees
E . None of the above.
100 % inspection of output is:
A . the best proven method to ensure quality
B . is expensive, ineffective approach to quality management
C . can never be, justified
D . can still leave some defects undetected