第1题
The three most common types of project cost estimates are:A.Order of magnitude, parametric

The three most common types of project cost estimates are:

A . Order of magnitude, parametric, and budget.

B . Parametric, definitive and top down.

C . Order of magnitude, definitive and bottom up.

D . Order of magnitude, budget and definitive.

E . Analogy, parametric and top down.

点击查看答案
第2题
140The three most common types of project cost estimates are: A.Order of magnitude, parame

140 The three most common types of project cost estimates are:

A. Order of magnitude, parametric, and budget.

B. Parametric, definitive and top down.

C. Order of magnitude, definitive and bottom up.

D. Order of magnitude, budget and definitive.

E. Analogy, parametric and top down

点击查看答案
第3题
100The most common method for pricing out non-burdened labor hours for a three year projec

100 The most common method for pricing out non-burdened labor hours for a three year project would be to:

A. Price out the hours at the actual salary of the people to be assigned.

B. Price out the work using a company-wide average labor rate.

C. Price out the work using a functional group average labor rate.

D. All of the above.

E. A and B only

点击查看答案
第4题
Project cash reserves are often used for adjustment in escalation factors which may be bey
ond the control of the project manager. Other than possibly financing (interest) costs and taxes, the three most common escalation factors involve changes in:

A . Overhead rates, labor rates and material costs.

B . Overhead rates, schedule slippages, and rework.

C . Rework, cost-of-living adjustments, and overtime.

D . Material costs, shipping cost, and scope changes.

E . Labor rates, material costs, and cost reporting.

点击查看答案
第5题
The most common method for pricing out non-burdened labor hours for a three year project w
ould be to:

A . Price out the hours at the actual salary of the people to be assigned.

B . Price out the work using a company-wide average labor rate.

C . Price out the work using a functional group average labor rate.

D . All of the above.

E . A and B only.

点击查看答案
第6题
144Project cash reserves are often used for adjustment in escalation factors which may be

144 Project cash reserves are often used for adjustment in escalation factors which may be beyond the control of the project manager. Other than possibly financing (interest) costs and taxes, the three most common escalation factors involve changes in:

A. Overhead rates, labor rates and material costs.

B. Overhead rates, schedule slippages, and rework.

C. Rework, cost-of-living adjustments, and overtime.

D. Material costs, shipping cost, and scope changes.

E. Labor rates, material costs, and cost reporting

点击查看答案
第7题
以下哪些属性名是公共逻辑节点所有的?()

A.Mod

B.Beh

C.Health

D.NamPlt

点击查看答案
第8题
我国目前生产的泡沫比例混合器有()。

A.PH系列

B.PHF系列

C.PHB系列

D.PHP系列

点击查看答案
第9题
对超出规格的流量将降低服务待遇继续转发,而不只是简单地被丢弃,此类PHB为:()。

A.CS

B.EF

C.AF

D.BE

点击查看答案
第10题
下列文件中用户Weblogic配置和创建域的命令是()。

A.startWeblogic

B./bea/wlserver_10.0/common/bin/config.sh

C./bea/my_project/domain/my_domain/startWeblogish

D./bea/common/config.sh

点击查看答案
第11题
In English poetry the _______ is regarded as the most common foot.

A.iamb

B.anapest

C.trochee

D.dactyl

点击查看答案
退出 登录/注册
发送账号至手机
密码将被重置
获取验证码
发送
温馨提示
该问题答案仅针对搜题卡用户开放,请点击购买搜题卡。
马上购买搜题卡
我已购买搜题卡, 登录账号 继续查看答案
重置密码
确认修改