194The schedule risk is the _____ . A.the accumulated "expected' durations which maintain

194 The schedule risk is the _____ .

A. the accumulated "expected' durations which maintain project completion.

B. Critical Path adjusted by "high-risk" activity float.

C. highest risk path that maintains quality.

D. Critical Path when calculated with "most likely" duration.

E. highest risk path that contributes the most risk toward the project completion

查看答案
答案
收藏
如果结果不匹配,请 联系老师 获取答案
您可能会需要:
您的账号:,可能还需要:
您的账号:
发送账号密码至手机
发送
安装优题宝APP,拍照搜题省时又省心!
更多“194The schedule risk is the __…”相关的问题
第1题
125Which of the following does not contribute to increased Schedule Risk? A.labor shortage

125 Which of the following does not contribute to increased Schedule Risk?

A. labor shortage

B. contractor claims

C. lack of access

D. sponsor scope changes

E. all may increase schedule risk

点击查看答案
第2题
The schedule risk is the _____ .Athe accumulated "expected' durations which maintain proje

The schedule risk is the _____ .

A the accumulated "expected' durations which maintain project completion.

B Critical Path adjusted by "high-risk" activity float.

C highest risk path that maintains quality.

D Critical Path when calculated with "most likely" duration.

E highest risk path that contributes the most risk toward the project completion.

点击查看答案
第3题
The Work Breakdown Structure (WBS) is the basis for communicating:A.Project scope, cost co

The Work Breakdown Structure (WBS) is the basis for communicating:

A.Project scope, cost control, schedule, quality

B.Project objectives, dependencies, plan, cost control

C.Project scope, schedule, staffing, cost control

D.Project scope, quality, schedule, dependencies

E.Project budget, schedule, risk factors, work assignments.

点击查看答案
第4题
Which of the following does not contribute to increased Schedule Risk?Alabor shortageBcont

Which of the following does not contribute to increased Schedule Risk?

A labor shortage

B contractor claims

C lack of access

D sponsor scope changes

E all may increase schedule risk

点击查看答案
第5题
Final risk quantification considers total risk impacts and _____ .Atranslates the impacts

Final risk quantification considers total risk impacts and _____ .

A translates the impacts into economic terms for analysis.

B concentrates on schedule impacts

C may not consider safety and environmental impacts

D A and B

E A and C

点击查看答案
第6题
190Final risk quantification considers total risk impacts and _____ . A.translates the imp

190 Final risk quantification considers total risk impacts and _____ .

A. translates the impacts into economic terms for analysis.

B. concentrates on schedule impacts

C. may not consider safety and environmental impacts

D. A and B

E. A and C

点击查看答案
第7题
156Deflection involves the transfer of risk by: A.Contracting out to another party B.Devel

156 Deflection involves the transfer of risk by:

A. Contracting out to another party

B. Developing schedule alternative.

C. Establishing functions under the project manager to handle risk events.

D. Disaster planning and responses.

E. None of the above

点击查看答案
第8题
Project trade-offs vary betweenA.risk, cost and schedule.B.direct cost, indirect cost, and

Project trade-offs vary between

A . risk, cost and schedule.

B . direct cost, indirect cost, and resource availability

C . quality, schedule and time

D . cost, quality and schedule

E . contract terms, scope and budget

点击查看答案
第9题
Deflection involves the transfer of risk by:AContracting out to another partyBDeveloping s

Deflection involves the transfer of risk by:

A Contracting out to another party

B Developing schedule alternative.

C Establishing functions under the project manager to handle risk events.

D Disaster planning and responses.

E None of the above.

点击查看答案
第10题
2The Work Breakdown Structure (WBS) is the basis for communicating: A.Project scope, cost

2 The Work Breakdown Structure (WBS) is the basis for communicating:

A. Project scope, cost control, schedule, quality

B. Project objectives, dependencies, plan, cost control

C. Project scope, schedule, staffing, cost control

D. Project scope, quality, schedule, dependencies

E. Project budget, schedule, risk factors, work assignments

点击查看答案
退出 登录/注册
发送账号至手机
密码将被重置
获取验证码
发送
温馨提示
该问题答案仅针对搜题卡用户开放,请点击购买搜题卡。
马上购买搜题卡
我已购买搜题卡, 登录账号 继续查看答案
重置密码
确认修改