[主观题]

99A project manager who, in a deference of opinion with the project controls engineer on h

99 A project manager who, in a deference of opinion with the project controls engineer on how costs are to be reported, dictates the format of the cost report may be said to have a conflict management style. A. Withdrawing

B. Forcing

C. Confrontational

D. Authoritarian

E. Combative

查看答案
答案
收藏
如果结果不匹配,请 联系老师 获取答案
您可能会需要:
您的账号:,可能还需要:
您的账号:
发送账号密码至手机
发送
安装优题宝APP,拍照搜题省时又省心!
更多“99A project manager who, in a …”相关的问题
第1题
99A line manager who is asked to wear two hats and function as a project manager at the sa

99 A line manager who is asked to wear two hats and function as a project manager at the same time is likely to exercise:

A. Authority

B. Power

C. Influence

D. All of the above

E. A and B only

点击查看答案
第2题
Of the following, who has the ultimate responsibility for meeting project quality objectiv
es?

A . Project Engineer

B . Project Manager

C . Functional Manager

D . Quality Assurance Manager

E . Project Owner

点击查看答案
第3题
3The quality objectives are approved in the conceptual stage of the project by the: A.Proj

3 The quality objectives are approved in the conceptual stage of the project by the:

A. Project Engineer

B. Project Manager

C. Functional Manager

D. Quality Assurance Manager

E. Project Owner

点击查看答案
第4题
92The main player in project communication is the A.sponsor B.project manager C.functional

92 The main player in project communication is the

A. sponsor

B. project manager

C. functional manager

D. functional team

E. All of the above

点击查看答案
第5题
The scope baseline/project charter is prepared by the:AProject managerBProject manager and

The scope baseline/project charter is prepared by the:

AProject manager

BProject manager and project office

CProject manager, project office and functional team

DProject manager, project office, functional team and project sponsor

EProject manager, project sponsor and customer/user

点击查看答案
第6题
93When a project manager is running over the budgeted costs, the project manager can typic

93 When a project manager is running over the budgeted costs, the project manager can typically _____ to attempt to get the project back on budget.

A. Reduce features and/or functionality

B. Increase risk.

C. Incur a schedule slippage (to obtain more favorable pricing due to lengthened delivery times)

D. All of the above.

E. A and B only

点击查看答案
第7题
160The project manager has, as a prime responsibility, to assure proper integration of act

160 The project manager has, as a prime responsibility, to assure proper integration of activities. In which organizational form. does the project manager probably have the easiest time in integrating work? A. Matrix

B. Classical

C. Expediter

D. Coordinator

E. Pure project

点击查看答案
第8题
75A project manager trying to communicate accurately to the team should use: A.the languag

75 A project manager trying to communicate accurately to the team should use:

A. the language of the team members

B. the language of the project manager

C. non-verbal methods

D. written memos

E. All of the above

点击查看答案
第9题
41The scope of a project can be expected to change if: A.The project manager must provide

41 The scope of a project can be expected to change if:

A. The project manager must provide cost estimates without having a design concept B. Oversimplification (underestimating) of the nature of the work occurs

C. The project manager is assigned after the project is defined, and the cost and schedule are approved

D. A clear objective is not provided

E. All of the above are possible based upon the situation

点击查看答案
第10题
Ensuring that all work is both authorized and funded by contractual documentation is the r
esponsibility of:

AThe project manager

BThe functional manager

CThe project sponsor

DThe client

EAll of the above

点击查看答案
第11题
97If a project manager communicates a verbal message to a subordinate, and the subordinate

97 If a project manager communicates a verbal message to a subordinate, and the subordinate leaves without saying a word, the project manager should assume:

A. the message was understood

B. the message was not understood

C. the subordinate discarded the information

D. the information was not appropriate

E. None of the above.

点击查看答案
退出 登录/注册
发送账号至手机
密码将被重置
获取验证码
发送
温馨提示
该问题答案仅针对搜题卡用户开放,请点击购买搜题卡。
马上购买搜题卡
我已购买搜题卡, 登录账号 继续查看答案
重置密码
确认修改