首页 > 职业资格考试
题目内容 (请给出正确答案)
[单选题]

A shortage of OPEC oil at current market prices will increase oil prices because of().

A.the law of elastic supply

B.the law of elastic demand

C.consumers will bid up the price of oil

D.all of the above

E.none of the above

查看答案
答案
收藏
如果结果不匹配,请 联系老师 获取答案
您可能会需要:
您的账号:,可能还需要:
您的账号:
发送账号密码至手机
发送
安装优题宝APP,拍照搜题省时又省心!
更多“A shortage of OPEC oil at curr…”相关的问题
第1题
All of the following words are acronyms except().

A.ad

B.OPEC

C.NATO

D.UNESCO

点击查看答案
第2题
国际垄断组织OPEC以限产、控制橡胶供给来控制国际市场上橡胶价格从而保护自己的利益。()
点击查看答案
第3题
以下那些因素会影响短期供给曲线()。

A.资源价格短期变动

B.主要粮产区大面积洪涝灾害

C.OPEC停产限价

D.以上都是

点击查看答案
第4题
欧佩克(OPEC)是一个稳定的、政府间石油供应组织,下列藐视属于欧佩克石油政策经历的发展阶段的是()。

A.提价保值战略

B.限产保价战略

C.低价保额战略

D.维持市场适度紧张战略

点击查看答案
第5题
We have to accept the fact()there is a shortage of qualified teachers in the countrysi

A.that

B.because

C.which

D.since

点击查看答案
第6题
At that time, in many countries there was() not enough gas and oil.

A.a surplus of

B.surplus of

C.shortage of

D.a shortage of

点击查看答案
第7题
7Which of the following does not contribute to increased Schedule Risk? A.labor shortage B

7 Which of the following does not contribute to increased Schedule Risk?

A. labor shortage

B. contractor claims

C. lack of access

D. sponsor scope changes

E. all may increase schedule risk

点击查看答案
第8题
125Which of the following does not contribute to increased Schedule Risk? A.labor shortage

125 Which of the following does not contribute to increased Schedule Risk?

A. labor shortage

B. contractor claims

C. lack of access

D. sponsor scope changes

E. all may increase schedule risk

点击查看答案
第9题
Which of the conditions listed will cause a refrigeration compressor to run constantly
without simultaneously decreasing the temperature in the refrigerated space?()

A.Shortage of refrigerant oil

B.Slight shortage of refrigerant

C.Excessive condenser cooling water flow

D.Faulty expansion valve

点击查看答案
第10题
Which of the following does not contribute to increased Schedule Risk?Alabor shortageBcont

Which of the following does not contribute to increased Schedule Risk?

A labor shortage

B contractor claims

C lack of access

D sponsor scope changes

E all may increase schedule risk

点击查看答案