Time was running out and we were getting______
此题为判断题(对,错)。
此题为判断题(对,错)。
A.having
B.have
C.with
D.to have
A、came down to
B、found out
C、took advantage of
D、took over
A.put off
B.take off
C.put out
D.take out
A.approach while coming to the left to take advantage of the current
B.drop an anchor outside the surf line,then pay out anchor line over the bow while the seas carry the boat toward the beach
C.approach slow enough so that the boat can be brought around to meet breaking seas on the bow
D.rig a drogue with tripping line over the bow,back ashore with drogue tripped between breakers
A.Insignificant.
B.Reduced.
C.Unchanged.
D.Increased.
E.Doubled.
A.where
B.which
C.to which
D.on which
67 As a project is carried out and slack time is consumed on individual tasks, the slack left over for the remaining tasks is:
A. Insignificant.
B. Reduced.
C. Unchanged.
D. Increased.
E. Doubled
A.Increase, decrease.
B.Increase, increase
C.Increase, increase or decrease.
D.Decrease, decrease.
E.Decrease, increase.
144 Free float is the amount of time that an activity may be delayed with out affecting the _____.
A. Early start of the succeeding activities.
B. Late start of the succeeding activities.
C. Project finish.
D. Cost of the project.
E. None of the above
A.Early start of the succeeding activities.
B.Late start of the succeeding activities.
C.Project finish.
D.Cost of the project.
E.None of the above.
185 In general, attempts to smooth out period to period resources will _____ the scheduled time and _____ project costs.
A. Increase, decrease.
B. Increase, increase
C. Increase, increase or decrease.
D. Decrease, decrease.
E. Decrease, increase